Harold Wells Associates. INC.: ESL’s Newest MRG

ESL is thrilled to introduce the newest addition to our growing network of Manufacturing Representative Groups, Harold Wells Associates, INC. Covering Northern California counties above San Luis Obispo, Kern and San Bernardino along with all Nevada counties with the exception of Nye, Lincoln and Clark, Harold Wells Associates, INC. offers a spectrum of services, committed to providing technical sales and support for customers. Serving customers since 1960, their broad engineering knowledge provides the integral link between manufacturers and clients equipping them to support a myriad of projects. HWA has developed a reputation based on integrity, straightforward business ethics, and engineering ability. Their expertise in products for critical emergency power, data center infrastructure products and municipal projects enables ESL to provide exceptional support and expertise to our customers in their covered counties.

ESL’s MRGs, like HWA, play a crucial role as the link between customers and our internal customer experience team, providing expert-level support to address challenges and queries. Together, we’re dedicated to elevating customer satisfaction and enhancing our sales support capabilities for an improved overall customer experience.

ESL proudly extends its reach of manufacturer representatives across the United States to deliver technical and customer service support for our Emergency and Entertainment Power Solutions products. To identify the suitable representative for your project, explore our representative map here!

Understanding 2023 NFPA 70B

The National Fire Protection Association (NFPA) 70B standard sets forth standards for “Electrical Equipment Maintenance”.  In its 2023 edition, chapter 9 of NFPA 70B transitions from a “Recommended Practice” to a more structured “Standard” with a heightened emphasis on mandatory compliance. However, unlike the National Electric Code (NEC), which is adopted by states as law, NFPA 70B is not directly mandated by law and should be regarded as a foundational guideline for ensuring electrical safety.

NFPA 70B aims to establish an Electrical Maintenance Program geared towards enhancing safety and reliability. The 2023 edition of NFPA 70B introduces new classifications for physical conditions of equipment (referred to as Levels 1, 2, and 3), which dictate the frequency of maintenance, ranging from 6 to 60 month intervals, contingent upon the product category.

When conducting maintenance, it is always advisable to adhere closely to the recommendations and instructions provided by equipment manufacturers, as this represents a best practice approach to ensure optimal performance and safety.

How does ESL’s equipment help comply with NFPA 70B?

When using portable generators in conjunction with an ESL StormSwitch®, TripleSwitch®, DualConnect™, or RotaryConnect™ system, it’s essential to ensure seamless operation.  To do so, first disconnect the portable generator from the ESL unit.  Then, connect a portable load bank to the portable generator in accordance with the generator manufacturer’s recommended maintenance instructions. This ensures efficient and reliable performance of the generator. For permanent generators integrated with an ESL TripleSwitch® or DualConnect™ system, a similar approach applies. In this case, simply connect a portable load bank to the output CAMs on the ESL unit, adhering closely to the generator manufacturer’s maintenance guidelines. This step facilitates optimal functioning and longevity of the generator setup within the ESL system.

To contact ESL for additional questions or a quote, click here.

ESL Power Systems Expands Partnership with LaSalle Representatives to Cover Additional States

ESL is thrilled to announce a significant expansion in our collaboration with LaSalle Representatives, one of our esteemed manufacturer representatives. LaSalle has been a key player in our network, serving the New Jersey and New York regions with unparalleled dedication. Now, we’re excited to extend their coverage to include Connecticut (CT), Maine (ME), Massachusetts (MA), Rhode Island (RI), Vermont (VT), New Hampshire (NH), and the entirety of New York (NY).

LaSalle Representatives has already proven their commitment to excellence by providing exceptional service in New York Counties, including Bronx, Queens, Manhattan, Kings, Richmond, Suffolk, Nassau, Suffolk, Westchester, Rockland, Putnam, and Orange. Their sales team boasts a rich history in the competitive NYC Metro Market, offering smart, sensible, and cost-effective solutions to our valued customers.

What sets LaSalle apart is their diverse team, comprised of individuals with backgrounds working directly for manufacturers, local distributors, and hands-on field experience. This unique blend enables them to collectively deliver the best service and support for each application, ensuring that our customers receive top-notch assistance.

As ESL Power Systems continues to grow and innovate, we actively seek out the best manufacturer representatives to join us in providing cutting-edge Emergency Power and Entertainment Power Solutions. LaSalle Representatives exemplifies excellence in embracing this opportunity, showcasing a deep understanding and expertise in ESL’s product lines. We take pride in our nationwide network of manufacturer representatives who offer technical expertise and customer service support. To discover the right representative for your state, we invite you to explore our representative map here. At ESL Power Systems, we are dedicated to powering your success and ensuring that you receive the highest level of support for your power solutions needs.

Critical Facilities Technologies: ESL’s Newest MRG

Manufacturing Representative Groups (MRGs) have become an increasingly important resource for businesses looking to enhance their customer service and sales support. At ESL, we recognize the value of MRGs and have made it our mission to find the most experienced and capable partners to help serve our customers across the country.

Our MRGs act as a liaison between our customers and our internal customer experience team, providing an expert level of knowledge and support to address any concerns or issues that may arise. By working with MRGs, we aim to increase customer satisfaction and enhance our sales support capabilities, ultimately improving the overall customer experience.

ESL is pleased to announce the latest addition to our expanding ensemble of Manufacturing Representative Groups, Critical Facilities Technologies (CFT). Based in the Midwest, CFT offers a range of services, including design, equipment procurement, project management, and more, to customers in Colorado, Wyoming, Montana, North Dakota, South Dakota, Minnesota, Nebraska, and Kansas. Their team of seasoned professionals possess a wide range of expertise and an impressive wealth of knowledge across diverse industries. This equips them to effectively guide and support projects of any scale, industry, or facility maturity level. Teaming up with CFT empowers ESL to now provide our customers with exceptional levels of support and expertise in these newly covered states. CFT’s extensive regional knowledge is especially valuable when it comes to designing and executing new projects.

ESL proudly provides manufacturer representatives throughout the United States to provide technical and customer service support for our Emergency Power and Entertainment Power Solutions products. To find the right representative for your state, check out or rep map here!

Understanding Hospital Emergency Power Supply Systems

Generators and emergency power systems are essential to enabling hospitals and health care facilities to effectively serve their communities

Learning Objectives

  • Gain a basic understanding of the generators and major components of an emergency power system for hospitals.
  • Understand the regulatory requirements for an emergency power system for hospitals.
  • Provide an approach to the design of these systems that accounts for key client and project needs.

Due to constant changes in medical standards of care, technologies and building systems, hospitals have become more reliant on electrical systems to function properly. As such, the reliability of the hospital building’s electrical system is more important than ever.

NFPA 70: National Electrical Code requires every hospital to have two independent power sources that provide a minimum level of reliability: a normal source (i.e., utility) and an alternate source (i.e., generator, fuel cell system or battery system).

Because most health care facilities have traditionally used generators as their alternate source due to runtime and maintenance advantages, this article will focus on generators and essential electrical system (i.e., “emergency power”) design.

For the purposes of this article, the NEC Article 517 term “essential electrical system” and Article 700 term “emergency power system” are synonymous because emergency systems are defined in NEC Article 700, which is applied specifically to hospitals in NEC Article 517.

An emergency system is defined by the NEC as “those systems legally required and classed as emergency by municipal, state, federal and other codes.”

NFPA 110: Standard for Emergency and Standby Power Systems defines the various components that makeup an emergency power system and comprises the emergency power supply and emergency power supply systems.

The EPS is the alternate power source, which in this case is the generator(s). The EPSS consists of the conductors, distribution equipment, overcurrent protective devices, transfer switches and all control, supervisory and support equipment needed for the system to operate between the generator and the transfer switch. Conductors, distribution equipment and overcurrent protective devices on the load side of the transfer switches are not considered part of the EPSS per NFPA 110, but are considered part of the overall emergency power system (see Figure 1).

Figure 1

A generator consists of two major components: the engine that provides the mechanical power via a rotating drive shaft and an alternator, which converts the mechanical energy to electrical energy. A transfer switch is an electrical piece of equipment that is configured to connect two incoming power sources (typically the utility source and the generator source) and one outgoing connection to the load(s) using a switching mechanism to select which of the two incoming sources is connected to the load (see Figure 2).

Figure 2: Typical generator set configuration with major components identified (this example is an indoor installation).

There are other regulatory bodies, codes and organizations that need to be considered depending on where the project is located:

Reviewing the requirements of these regulatory bodies, codes and publications is recommended at the onset of a new project to determine any project specific impacts as the adopted codes vary by state and local jurisdictions.

Emergency power design considerations

Generators are manufactured with two ratings: prime and standby. A prime rated generator is designed to be operated continuously as the primary source of power for the system, typically used where utility power is not available such as extremely rural locations. A standby rated generator is designed to operate intermittently when the main source of power fails or during generator testing. Emergency power systems for hospitals use generators rated for standby use because the generator is functioning as the alternate source of power.

NFPA 110 requires generators and the EPSS to have a Classification, Type and Level. The “Class” defines the minimum run time in hours. The “Type” defines the maximum time, in seconds, to transfer to the alternate source after power loss. The “Level” defines the risk to human life due to the failure of the system.

Hospital emergency power systems typically must be Class 96 (minimum 96 hours of runtime) or have an operational plan to supply 96 hours of fuel to the site, Type 10 (maximum 10 seconds to transfer) and Level 1 (failure of system could result in loss of human life or serious injuries).

The two common fuel types for hospital generators are No. 2 diesel and natural gas. Typically, hospitals opt to install diesel generators for two primary reasons.

  • Hospitals are required to either have 96 hours of fuel stored on-site or an agreement to have the additional fuel delivered to maintain 96 hours of continuous runtime (see the Joint Commission’s Emergency Management 96 Hour Plan for details). Natural gas is delivered to the hospital from the utility via underground distribution piping and cannot be stored on-site in the quantities required. Authorities having jurisdiction do not typically consider an off-site fuel source reliable enough to be the sole fuel source for generators (see NEC 700.12(D)(2)).
  • Emergency generators and the EPSS for hospitals are required to be NFPA 110 Type 10 systems. This requires the system to restore power to the loads in less than 10 seconds. Most natural gas generators are not able to meet this requirement due to the time it takes the generator engine to start.

Generators can be installed indoors or outdoors. Indoor installations have the advantage of being better protected from weather and vehicular traffic and provide ease of maintenance but are typically a higher first cost. The generator room needs to be designed to account for the substantial airflow required to both cool the generators and provide combustion air to the generator. Ideally the air intake is at the back of the room and air discharge is at the front to promote proper airflow over the engine block to facilitate engine cooling. Rooms with air intake or discharge from above or one side of the room may create cooling issues and should be avoided. Design also needs to consider the acoustical impact of the generators at both the air intake and discharge locations. Generators create a lot of noise and sound attenuation within the room may be required to meet local ordinances or hospital requirements (see Figure 3).

Figure 3: Example of an indoor (left) and outdoor (right) generator installation

Outdoor installations typically have a lower first cost but are not as accessible and may be susceptible to degradation of the equipment over time if not properly protected. Typically, a generator installed outdoors will have a weather-proof enclosure with dampers and heating elements to keep the environment within the enclosure controlled to an extent. The enclosure also may have a sub-base tank for fuel storage, sound attenuation or raised personnel platforms depending on the specific requirements of the project. The self-contained nature of an outdoor generator can be advantageous as the issues with ventilation and fuel oil delivery are simplified.

Emergency power distribution equipment

The complete essential electrical system, as defined by NEC Article 517, consists of the EPSS (i.e., everything between the transfer switch and the generator, including the transfer switch) and the switchboards, panels, transformers, feeders and overcurrent protective devices that are connected to the load side of the transfer switch.

In hospitals, the essential electrical system is divided into three separate branches per NEC Article 517: life safety, critical and equipment. Each branch has its own automatic transfer switch, or switches depending on the size of the system, to segregate power distribution in the hospital:

  • The life safety branch is limited to circuits essential to life safety and include illumination of means of egress, exit signs, select alarm and alerting systems, communication systems, generator set accessories, elevators and select automatic doors.
  • The critical branch is primary reserved for systems and equipment that are essential to patient care and safety and include, but is not limited to, task illumination and receptacles patient care spaces, nurse call systems, clinical information technology systems and select power circuits needed for effective hospital operation.
  • The equipment branch primarily consists of mechanical equipment required for effective hospital operation and typically includes air handling units, pumps, boilers, chillers, medical vacuum/compressed air equipment, kitchen equipment and any other optional loads the hospital considers necessary to maintain the facility when utility power is lost.

Transfer switches can be either automatic, nonautomatic or manual. Hospitals primarily use automatic transfer switches, which transfers to generator without personnel input. However, nonautomatic and manual transfer switches are used for optional loads when automatic transfer is not required or desired due to available generator capacity.

The difference between nonautomatic and manual is nonautomatic has an automatic transfer mechanism, but transfer requires personnel to initiate; manual requires personnel to physically move a mechanism by hand from one source to the other.

Automatic transfer switches have three transition types. Open transition is the most common in hospitals and disconnects from the primary source of power (utility) before connecting to the alternate source (generator), also known as “break before make.” Delayed transition is similar to open transition but has a built-in time delay where it is disconnected from both sources for an extended period and is most commonly used for mechanical equipment to allow time for motors to slow down before connecting to another source of power.

Closed transition is less common due to utility company approval needed before installation because closed transition briefly parallels utility with the generator(s). Closed transition will briefly connect to both sources before disconnecting from one source or “make before break.” The advantage is the facility does not experience a brief “blip” in power during monthly generator tests or when transferring from generator back to utility power.

Pictured: 3-Way Manual Transfer Switch includes three breakers which allow the permanent generator to be simultaneously connected to both a load bank (permanent generator testing) and the ATS

Many hospitals require automatic transfer switches to have bypass isolation. Bypass isolation is a switch provided with two switching mechanisms configured so that one switch can be removed and worked on in a safe manner while the other switching mechanism provides power to the loads. The design needs to consider the increased footprint and cost for bypass isolation switches over transfer switches with a single switching mechanism.

Common emergency power system configurations

There are two common system configurations that most hospitals use: standalone and paralleled systems. A standalone system consists of a single generator with transfer switches separating life safety, critical and equipment branch loads. The generator starts when a start signal is received from any of the transfer switches and each transfer switch will transfer to generator power once the switch senses the generator source has reached system voltage and frequency.

The advantage of a standalone system is typically lower first cost in comparison to a similarly sized multi-generator configuration as well as less complicated controls. The disadvantage is failure of the singular generator results in the facility having no backup power to essential loads during the utility outage. In addition, the standalone system has no ability to shed less critical loads if the generator is unable to keep up with the demand load of the facility during the utility outage unless a building automation system interface is provided to monitor real-time load on the generator and shutdown select equipment when it senses the generator is reaching peak capacity. This additional feature will add cost to the project if implemented, which needs to be considered during design.

A paralleled configuration consists of two or more generators connected in parallel to a common bus with multiple transfer switches. Once a start signal is sent by a transfer switch, the first generator to reach rated voltage and frequency will close to the bus. Transfer switches will start transferring to the generator source and subsequent generators will close to the common bus once they reach voltage/frequency and are synchronized with the first generator.

The advantage of paralleled configuration is it provides equipment redundancy in the event a generator fails to start or is offline for repairs. Additionally, the system is able to load shed lower priority transfer switches (i.e., disconnect them from the generator source) if the generators are unable to keep up with the demand load. This prevents a complete outage to the facility and ensures the most critical loads remain operational.

Electrical system redundancy

Hospitals are constantly preparing for the worst-case scenario to ensure they deliver the highest level of care to their patients. Equipment and system redundancy is a priority. It is recommended that designers discuss equipment and system configurations that provide inherent redundancy with the client to ensure the design meets the client’s redundancy requirements and project budget.

For generators, a common configuration is to provide the quantity of generators that provide N+1 redundancy in the event one of the generators fails to start or is offline for repair. For example, if a facility has a peak demand load of 900 kilowatts and the hospital wants N+1 redundancy, providing three 500-kilowatt generators in a paralleled configuration would meet the redundancy goal.

Another strategy to improve the resiliency of the essential electrical system is to separate critical or equipment branches of emergency power into “Critical A” and “Critical B,” each having its own automatic transfer switch. This limits the potential outage to the facility due to a catastrophic failure to a transfer switch or other distribution equipment on that branch of power. It also allows for critical care areas of the hospital to be connected entirely to emergency power while maintaining two separate sources of power which is required by code.

Generator fuel

As previously noted, No. 2 fuel oil is the most common fuel source for hospital emergency generators. Typically, a hospital will have a minimum of 96 hours of fuel on-site, and may have less if complying with the Joint Commission’s Emergency Management 96 Hour Plan or in a local jurisdiction that has a less stringent requirement.

Depending on the utility’s reliability, the generators may only run 15 to 20 hours a year to meet the monthly/yearly testing requirements for each generator. This results in fuel that may sit for extended periods before being used. To avoid degradation of the quality of fuel, most hospitals will install a fuel polishing system to remove water and other particulates from the fuel oil. If a centralized tank is installed to serve multiple generators, a fuel oil pumping system will supply and return fuel to the generator day tanks that are located at each generator.

Modifications, upgrades to existing electrical systems

When designing a generator or emergency power system upgrade for an existing hospital, phasing and outages need to be considered at the outset of the design as they can have a huge impact on hospital operations. Hospitals cannot afford to shut down critical services at any time.

Although outages are unavoidable with a major system upgrade, discussions with hospital administration and key personnel early in the design is crucial as it may require a different design approach to meet the project goals and maintain the facility during construction.

Generators and emergency power systems are an essential system in hospitals to ensure the operational impact of a utility outage is minimal. As health care facilities and staff continue to adapt to the latest standards of care, the need for more robust and reliable emergency power systems will be required.

When initiating the design of a new emergency power system or upgrade to an existing system, owners and design professionals need to be in constant communication to ensure the design aligns with the project goals, budget and hospital’s operational priorities.

Emergency generators and the design of power systems play a crucial role in ensuring reliable power is provided at each facility by providing an alternate source of power in the event the utility source is interrupted.

View the original article and related content on Consulting Specifying Engineer