Are You Ready for the 2017 NEC Updates?

Have no fear, ESL is here! ESL’s TripleSwitch is 2017 NEC 700.3 (F) compliant when used in conjunction with an ATS. According to 2017 NEC provision 700.3(F), legally required systems must be able to connect a temporary source of power for emergency systems which rely on a single alternate source of power which will be disabled for maintenance…

Read more

Streamline Load Bank Testing

Load bank testing is necessary for facilities such as water wastewater plants, data centers, high rise buildings, and nursing care centers. According to NEC Article 708 and NFPA 110, automatic transfer switches are required to be regularly tested. These regulations are in place to ensure that when utility power goes down, the backup equipment will…

Read more

ESL to Exhibit at the 2015 American Society for Healthcare Engineering Annual Conference and Technical Exhibition

Emergency backup power planning is at the heart of designing for critical facilities such as hospitals and data centers. Engineers have much to consider when they design hospitals and buildings that are intended to provide critical care to those in need. This weekend, ESL Power Systems, Inc. will be bringing a few of their emergency…

Read more