Many questions arise when beginning your first emergency power connection equipment project. ESL has put together some Frequently Asked Questions from customers throughout the years to assist as you move forward with choosing your back up power solution.

General

Q: How do I know what product will best work with my specific needs?
A: ESL’s knowledgeable sales personnel will gladly assist with helping to identify the proper product for your application. The key factors will be the voltage system and the desired emergency load that is to be fed.

Q: What is UL 1008 and how does it affect me? 
A: Local building inspectors typically require all new electrical equipment installed in their jurisdiction to be “Listed” which means the equipment has been approved by Underwriter Laboratories or another recognized test lab. For standby systems that allow portable generator connection, UL 1008 is the proper standard to comply to. If the equipment is not Listed, it may not be acceptable to the inspector.

Q: Is it difficult to make the generator connection to the StormSwitch®, TripleSwitch® or TempTap® product line?
A: No, they utilize the industry standard 400A series 16 cam-style connectors. ESL’s StormSwitch, TripleSwitch and TempTap are color-coded to the voltage, e.g. 208Y/120 green, white, black, red, blue.

Q: Do the generators have the same color-coded plugs that the StormSwitch, TempTap, and TripleSwitch have? 
A: ESL cannot guarantee that. Industry standard is green for ground, white for neutral, and typically black for “A” phase, red for “B” phase and blue for “C” phase. When entering in an agreement for generator service, it is recommended that you request the aforementioned color-coding for the cams.

StormSwitch

 Q: What are the advantages/disadvantages of using a manual transfer switch with a portable generator versus an automatic transfer switch with a permanent generator?
A: Advantages:
Significantly lower cost
No on-site fuel storage required
No maintenance or standard periodic testing
Easier installation – days instead of weeks
Smaller size
Portable generator can be rented or used at other facilities
Permanent generator requires multiple permits

Disadvantages:
Longer time before generator power is established

Q: Can the StormSwitch be Service Entrance Rated?
A: Yes, the StormSwitch has the option to be SUSE (Suitable for Use as Service Entrance in the USA). This option should only be used when the StormSwitch is installed at the building service entrance.

 Q: What is the reason an additional circuit breaker is available with the purchase of a StormSwitch?
A: Circuit breakers provide over current protection; switches do not. If the supplied generator does not have built in over current protection, then it is recommended that the generator disconnect and the StormSwitch be equipped with a circuit breaker rather than a switch. Also depending on your specific application, you may or may not need over current protection on the utility side. Again, ESL’s knowledgeable Sales personnel will gladly help you in deciding what combination works best for your application.

 Q: How does the StormSwitch compare to a standard “double-throw” or “double-key” transfer box?
A: The traditional “safety switch” and/or “double-throw” switches do not provide the over current protection option that is available in ESL’s StormSwitch. These “safety switch” and/or “double-throw” switches are intended for “hard wiring” and therefore would require a licensed electrician (difficult to find one available as they are in high demand during power outages) to connect and disconnect the generator.

 Additional StormSwitch Q&A can be found here

 TempTap

 Q: What is a TempTap?
A; Also referred to as a docking station or tap box, ESL’s TempTap is a means for direct connection from the generator to the building’s switchgear.

Q: Is there any protection offered in a TempTap?
A: Locking doors and internal connection points to keep unauthorized persons from the device. The TempTap is designed to be a safe and simple pass-through box mounted to the outside of a building. It should be used in conjunction with a with a transfer switch or a utility disconnect.

TripleSwitch

 Q: What is the TripleSwitch designed to do?
A: The UL 1008 Listed TripleSwitch was designed to simplify and reduce the cost of load bank testing procedures and to provide a backup for the permanent generator. This unique 3-way manual transfer switch system provides a quick and completely safe way with mechanically interlocked breakers to supply power to the facility from a portable emergency standby generator in the event the utility power is disrupted due to a power loss when the permanent generators are offline.

Q: I know it’s easy to show the ease of use and the safety aspects of the TripleSwitch, but are there other advantages as well?
A: Yes, an added benefit is a reduction in down time when connecting and disconnecting for load bank testing. Having quick connect cam locks for connecting the portable load bank means set up time is reduced to minutes not hours.

Q: How difficult is this to install a TripleSwitch on a job site?
A: Being UL1008 Listed means the TripleSwitch is built in an enclosure designed to provide the proper bend radius and space for the cable amperage being used. The TripleSwitch is an integrated unit with all necessary breakers and cam-lock connections. This means the contractor is installing one unit thus reducing conduit runs and cable lengths as opposed to alternative multiple unit and switchgear solutions that would require multiple conduit runs.

Q: Can I install the TripleSwitch with an existing permanent generator?
A: Yes, very easily. Being an integrated unit, you typically do not need to design-in new breakers and interlock methods. It is a drop-in solution connecting into the existing connection between the ATS and permanent generator.

ESL’s knowledgeable sales personnel is here to answer any additional questions you may have. Please feel free to contact us! ESL is always here to help!

3 Reasons Why UL 1008 Should Be Specified

ul-3-reasons

When comparing NRTL Listings of different products, it is important to know what the appropriate UL standards are and how they apply to your specific application. You may not always be purchasing what you think you are purchasing. UL 1008 was specifically created for transfer switch equipment. Products with a UL 1008 certification ensure the complete assembly is certified and has undergone rigorous testing to validate performance, safety, and reliability. Non-Automatic transfer switches that are Listed under the UL 1008 standard are evaluated in accordance with Articles 517-Health Care Facilities, 702-Optional Standby Systems of the National Electrical Code (ANSI/NFPA 70) and the National Fire Protection Association Standard for Health Care Facilities (ANSI/NFPA 99). The local inspection process by the AHJ is typically much easier when emergency power transfer switch equipment is UL 1008 Listed. So what are some basic reasons to purchase UL 1008? How about these three…

  1. Your UL 1008 listed Manual Transfer Switch will be listed the same as an Automatic Transfer Switch unit. This means continuity of Listing in all your transfer switch designs.
  2. No need to “reinvent the wheel”. With a UL 1008 listed transfer switch for your project, there is no need to verify if your design meets all the requirements for a transfer switch. This should shorten your design time on your project.
  3. By specifying a UL1008 Listed unit, you are assured that the unit supplied is not just a UL 50 enclosure and/or UL Listed components but has been tested as a complete unit. AHJ are becoming more aware that a manual transfer switch should be listed the same as an automatic transfer switch since they perform the same basic function.

When there is a proper solution why go any other way? It just makes sense!

ESL’s line of emergency power connection equipment for commercial and industrial applications is UL/cUL 1008 Listed for StormSwitch® – Manual Transfer Switches up to 3000A, TempTap® – Generator Docking Stations up to 3200A, and TripleSwitch® – 3-Way Manual Transfer Switches up to 3000A. To get a quote on your next project contact us!

Do You Have A Contingency Plan? The Cost of NOT Being Prepared

Contingency Plan

Planning ahead for an emergency can be challenging but ESL is here to help make things easier with our line of UL 1008 Listed Emergency Power Products. Our manual transfer switches and tap boxes ensure a quick, safe generator hook-up and operation for any building and ensure time without power is minimal. There are countless things to consider when planning for the worst case scenario however; the potential for loss of power should be a top priority when trying to keep business continuity intact.

Contingency Planning

A contingency plan is a course of action designed to help an organization respond effectively to a significantly disruptive event or situation.

As businesses have become more reliant on immediate availability, the tolerance for downtime has decreased. A disaster can have devastating effects on a business because of this mind set. Having a contingency plan is a key component of business continuity, disaster recovery, and risk management.

Common Steps for a Contingency Plan Include:

  1. Perform a risk analysis. Determine what risks are most likely to occur for your business. Is your organization likely to experience natural disasters such as hurricanes or floods?
  2. Identify possible scenarios. Detail what could happen if major risks were to occur.
  3. Conduct a business impact analysis. Determine which of an organization’s functions are essential.
  4. Find ways to reduce the risk. It’s not enough to develop the plan; you need to take steps to improve preventative strategies. For example, you may realize you need special insurance, need a data back-up system or an emergency generator for power. Devise a plan for each scenario.
  5. Develop a contingency plan policy statement. This will include overview and main goals of the plan. Communicate the plan to all employees and provide personnel the proper training to improve plan effectiveness and overall organization preparedness.
  6. Test the plan. The testing should include short-term shutdowns in critical areas done in real time to ensure the plan goes as expected.
  7. Ensure plan maintenance. The plan should be a living document that is updated regularly to remain current with system improvements and organizational changes.

Preparing for a disaster requires an all-inclusive approach that covers facility equipment, power, connectivity, and testing.  This will ensure recovery is achieved within a targeted time frame. The goal is always to re-establish full function to the organization as quickly and smoothly as possible.

The Cost:

There are a wide range of disasters, natural and otherwise, that lead to recovery situations. Certain types of disaster may seem unlikely, but it is important to recognize probabilities and plan ahead.

Reduce the risk of power outages and ensure you have back up power when you need it. Installing a manual transfer switch in conjunction with a portable power generator is an economic solution to help minimize downtime during emergency power loss.

While implementing a thorough plan is no small task, the potential benefits of being proactive are significant.


To learn more about ESL and our emergency power product line, visit www.eslpwr.com/emergency-power where you can download specifications, read recently published case studies and articles, and watch our short demo videos.

ESL StormSwitch™ – Keeping the Power On

The damage caused during this historic hurricane season serves as an unfortunate reminder of the need for contingency planning.  From everyday citizens to public institutions, the impact that the barrage has had on communities in the path of the storms will be felt for years to come. The amount of people left without power during this hurricane season is unprecedented; according to the U.S. Department of Energy an estimated 13 million people have experienced sustained outages in the U.S. mainland, Puerto Rico and The Virgin Islands this season. As recovery efforts continue, many ESL StormSwitch™ manual transfer switches are operating in the affected areas to help provide backup power to critical facilities, banks and gas stations.

For more information on how ESL can help be prepared for the next power outage click here.

ESL would like to wish all those affected by the natural disasters a speedy recovery.

ESL actively supports the efforts of the American Red Cross. If you would also like to make a donation to help with relief efforts click here.

Do You have an Effective Emergency Backup System?

emergency-prepardness-banner
September is National Preparedness Month.  Is your business ready in the event of an emergency? We can mitigate risk, both to our lives and our property, by being proactive and planning ahead for a disaster.

As a business owner, being prepared means having an effective emergency backup system.  An important step in implementing this system is selecting a manual transfer switch that can quickly and safely be connected to a generator should utility power be out for a prolonged period of time. In ESL’s blog, 6-Ways to Select a Manual Transfer Switch we cover the factors that should be considered when determining which type of transfer switch is most suitable for your business.

Ensure your business will be the one to have the lights on in the aftermath of an emergency…

In addition to a reliable back up system, your company should have a plan. Determine how you’ll get your business back up and running. Make a Check list! Assign responsibilities and determine if additional training is necessary to perform the tasks assigned. Include a backup person responsible for a task if your primary is off site.

Plan regularly scheduled maintenance. Keep your equipment up to standards and ready at a moment’s notice. NEC regional standards provide guidelines for regularly testing electrical equipment. ESL’s TripleSwitch —  a 3-way manual transfer switch —  simplifies load bank testing procedures and also provides a safe way to connect a backup generator in the event a permanent generator malfunctions. Read more about this process in our recent blog on how to Streamline Load Bank Testing.

Ensure your business will be the one to have the lights on in the aftermath of an emergency, ready to serve your customers at a time when demand is high!

Remember, it’s never too late to make sure that you’re prepared for an emergency or loss of power!